Five-phase umbrella playbook for an initiative shepherd. Dispatches to phase-deep skills (Research, PoC, Scoping, Implementation) at the right moment.

๐Ÿงฉ One of 7 skills in the bitwarden/ai-plugins package โ€” works on its own, and pairs well with its siblings.

This is the playbook your agent receives when the skill activates โ€” you don't need to read it to use the skill, but it's here to audit before installing.

End-to-end umbrella playbook for an initiative shepherd, covering all five phases of the Software Initiative Funnel: Identification โ†’ Research โ†’ Proof of Concept โ†’ Scoping & Commitment โ†’ Implementation. Maps each phase's effort, deliverables, and decision gate; holds the line on what the shepherd produces vs. what gets handed to teams. Fetch the canonical funnel page via get_confluence_page when entry/exit criteria or full template detail is needed.

The Rule of Ownership (Hold Throughout)

You own the initiative. Each receiving team owns how it executes its part.

Every phase has a single sentence to remember: when you start writing the team's stories, the team won't own the work. When you stop coordinating across teams, the initiative drifts. Both failures are yours to prevent.

For the agent-neutral, team-side view of the same boundary (the version tech leads read), invoke Skill(navigating-the-initiative-funnel) in bitwarden-delivery-tools. Reading both perspectives keeps you honest about where the line actually sits.

Time and Effort Expectations

The funnel page sets these benchmarks. They're not aspirational โ€” they're the basis for capacity planning when leadership asks "what does it cost to shepherd this?"

PhaseDurationShepherd EffortDecision Maker
1 โ€” Identification~1 week4โ€“8 hoursHolistic engineering leadership
2 โ€” Research3โ€“5 weeks40โ€“80 hoursEng leadership + Architecture Council
3 โ€” Proof of Concept2โ€“4 weeks40โ€“80 hoursEng leadership + Architecture Council
4 โ€” Scoping & Commitment2โ€“4 weeks30โ€“50 hoursEngineering leadership (Director+)
5 โ€” Implementation2โ€“6 months10โ€“20 hours/monthTeams execute; shepherd coordinates

Total: 150โ€“300 hours of shepherd time over 4โ€“9 months for a medium initiative โ€” roughly 5โ€“10% of one person's time with higher concentration in Research and PoC.

Phase-by-Phase: What the Shepherd Does

Phase 1 โ€” Identification

Purpose: Capture enough context for meaningful evaluation without premature commitment of resources.

You produce:

  • A BW Initiative issue under the Bitwarden Company (BW) project. Type: Initiative. Assignee: you (the proposed shepherd). Reporter: whoever surfaced the problem. Priority: a placeholder ("TBD - Awaiting Research" or Medium).
  • A description distilled from the upstream ARCH idea (if one exists) into an executive-readable summary โ€” not a copy of the full TSI template. Pattern, link inventory, and field-by-field guidance live in Idea-Based Initiatives.
  • A work item link from the ARCH idea (in Jira Product Discovery) to the BW initiative. This is the foundational traceability link โ€” every idea-based initiative must have one.
  • Initial "Relates to" links: prior attempts, adjacent SRE/BRE/TSD/PM tickets, anything the ARCH idea's own research surfaced.
  • An ARCH idea status update to "1๏ธโƒฃ Identification" in JPD.

Decision gate: Holistic engineering leadership decides Proceed / Hold / Decline.

What you do NOT do: Pre-scope the solution. Research hasn't happened yet. Resist the urge to come in with an answer.

Phase 2 โ€” Research

Purpose: Deeply understand the problem space and explore potential solutions before committing to direction.

You produce:

  • 3โ€“5 stakeholder interviews (the affected teams' tech leads are likely subjects).
  • A current-state analysis surveying existing implementations across the codebase โ€” inconsistencies, workarounds, technical debt โ€” with impact quantified where possible.
  • 2โ€“4 documented solution approaches with explicit trade-offs.
  • An Architectural Assessment in Confluence under the EN-space assessments folder, refined through stakeholder review.
  • Optional preview at Architecture Council for major initiatives.
  • ARCH idea status updated to "2๏ธโƒฃ Research".

Decision gate: Engineering leadership with Architecture Council input. Proceed to PoC / Continue Research / Hold / Decline.

Deep skill: Skill(running-an-architectural-assessment) for stakeholder interview structure, current-state analysis, options generation, and the Architectural Assessment template.

Phase 3 โ€” Proof of Concept

Purpose: Validate the recommended solution works in practice within Bitwarden's codebase before committing to full implementation. Reduce risk through hands-on experimentation.

You produce:

  • A PoC area chosen in coordination with the owning team's tech lead โ€” representative but contained (~1โ€“5 files or one module).
  • The framework or foundation that broader rollout will reuse, plus 1โ€“3 production-quality example implementations.
  • One or more PRs (may or may not be merged; mark "PoC" in title if not).
  • An Architecture Council walkthrough โ€” 15โ€“30 minutes, with the PoC PR, the findings (what worked, what didn't, what would need to change), and the proposed direction.
  • A draft ADR (status: Proposed) following the Bitwarden ADR template. ADRs live in the centralized bitwarden/contributing-docs repository under docs/architecture/adr/ โ€” there is no per-repo ADR directory.
  • Close-to-code documentation for the framework and example implementations (per Documentation Patterns) โ€” a README.md alongside the framework code, folder-level notes near examples, and CLAUDE.md updates where new patterns are introduced. The deep skill covers what each home (close-to-code vs. centralized contributing-docs) is for.
  • ARCH idea status updated to "3๏ธโƒฃ Proof of Concept".

Decision gate: Engineering leadership with Architecture Council recommendation. Proceed to Scoping / Revise PoC / Return to Research / Decline.

Deep skill: Skill(running-a-proof-of-concept) for PoC area selection, building the framework, Architecture Council prep, and ADR drafting.

Phase 4 โ€” Scoping & Commitment

Purpose: Transform a validated PoC into a concrete implementation plan with effort estimates, team assignments, and executive commitment.

You produce:

  • A High-Level Architecture Plan in Confluence under the EN-space planning folder: scope, approach (phasing, migration path), team alignment, dependencies, risk mitigation, success metrics, documentation plan.
  • Child epics under the BW initiative โ€” typically one per team or major module. Each epic carries its area of the codebase, the PoC PR reference, expected outcomes, and success criteria.
  • A scheduled handoff meeting with each receiving team (1 hour per team, structured 20/15/15/10): 20 min present, 15 min Q&A, 15 min team's initial breakdown thinking, 10 min commit to a breakdown date.
  • A cost/benefit analysis documented in the architecture plan.
  • An initiative priority (Critical / High / Medium / Low) updated on the BW initiative.
  • A leadership presentation seeking explicit go/no-go with capacity commitment.
  • Operational prioritization with engineering leadership: target start date, quarter, relative priority against teams' other commitments, sprint capacity allocation.
  • A finalized ADR (status: Accepted) with timeline.
  • ARCH idea status updated to "4๏ธโƒฃ Scoping & Commitment".

Decision gate: VP of Engineering / CTO. Proceed to Implementation / Rescope / Defer / Decline.

Critical anti-pattern: You writing the team's stories. The team does the breakdown โ€” not you. You review breakdowns for consistency with the initiative's vision, not to rewrite stories.

Deep skill: Skill(scoping-and-handing-off-to-teams). The Phase 4โ†’5 handoff is a work transition from the originating side; that skill composes Skill(running-work-transitions) from bitwarden-delivery-tools for the transition mechanics.

Phase 5 โ€” Implementation

Purpose: Execute across teams. You coordinate, support, and maintain consistency โ€” you do not implement.

You produce / maintain:

  • Communication channels: optional #initiative-<name> Slack channel with pinned PoC PR / ADR / architecture plan / Jira dashboard; bi-weekly tech-leads sync (30โ€“45 min); optional office hours; monthly stakeholder-sync update.
  • A kickoff meeting with all teams (1 hour) recapping problem, solution, PoC results, dependencies, communication channels.
  • Approach support โ€” answering questions in Slack, jumping on Meets when text isn't enough, clarifying edge cases not covered in PoC.
  • Review-for-consistency on early PRs from each team โ€” not detailed code review. The team's PR review still happens inside the team.
  • Cross-team consistency: early drift detection, judgment on legitimate variation vs. drift that undermines consistency, an FAQ that captures recurring questions and solutions.
  • Weekly progress tracking (dashboard + Slack channel), bi-weekly tech-leads sync, monthly leadership update.
  • Documentation produced progressively (drafted at 40% complete, finalized at 90%): technical guide, migration guide, ADR final updates, contributing-guide updates, runbooks as relevant.
  • Knowledge transfer โ€” a tech talk or brown bag in the final weeks (45โ€“60 min).
  • A retrospective within 2 weeks of completion (shepherd + tech leads from all affected teams, 1.5 hours).
  • An impact measurement 3โ€“6 months later against the success metrics defined in Scoping.
  • ARCH idea status updated to "5๏ธโƒฃ Implementation", then to its final status at completion.

Deep skill: Skill(coordinating-implementation-across-teams). For the Phase 4โ†’5 transition's later stages (Phases 3โ€“6 of the Work Transition Playbook on the originating side โ€” pulse check at ~30 days, retrospective at ~90 days, closure), that skill composes Skill(running-work-transitions) from bitwarden-delivery-tools.

Cross-Cutting Practices

These apply across phases:

  • Keep the ARCH idea status synchronized. The funnel-phase status (1๏ธโƒฃโ€“5๏ธโƒฃ) is how Architecture and engineering leadership see your initiative in JPD views. Updating only the BW initiative goes stale at the portfolio level.
  • Link aggressively on the BW initiative. "Relates to" SRE/BRE/PM tickets, prior-attempt tickets, adjacent initiatives, operational tickets that emerge. The link inventory is one of the most valuable artifacts you maintain.
  • Use Jira comments as a timeline. Significant decisions, stakeholder feedback, mid-course corrections, cross-team dependency resolutions โ€” these belong in initiative comments. They become invaluable at retrospective and for future shepherds facing similar work.
  • Update the initiative description as the approach evolves. It's a living summary, not a research document. Detailed research belongs in the Architectural Assessment, implementation details in epics and stories, decision rationale in the ADR.

When the Initiative Is Smaller Than the Funnel Was Designed For

The funnel is built for initiatives that genuinely span multiple teams. For an initiative that lives largely in one team's domain or one adjacent team, a tech lead may shepherd directly via bitwarden-tech-lead rather than this plugin. If you're operating as the shepherd for a small-scope initiative, run a compressed version: lighter Architectural Assessment, smaller PoC, single handoff meeting, less formal cross-team coordination during Implementation. The phases still apply; the artifacts get smaller.

The minimum invariant regardless of scope: a documented problem, a documented decision, capacity explicitly committed before Implementation starts, and a retrospective at the end.

Reference

  • Software Initiative Funnel โ€” canonical phase-by-phase document. Fetch via get_confluence_page when the full template, the entry/exit criteria, or the example timeline table is needed.
  • Idea-Based Initiatives โ€” canonical BW Initiative anatomy, description template, link conventions, phase-by-phase initiative evolution.
  • Work Transition Playbook โ€” canonical six-phase transition reference; the Phase 4โ†’5 handoff is a transition from the originating side.
  • Architecture / Engineering Operating Model โ€” how Architecture's initiative portfolio gets communicated (Architecture Initiative Review, Architecture/Platform sync).
  • Related: Skill(running-an-architectural-assessment), Skill(running-a-proof-of-concept), Skill(scoping-and-handing-off-to-teams), Skill(coordinating-implementation-across-teams), Skill(curating-the-strategy-ideas-backlog); from bitwarden-delivery-tools: Skill(navigating-the-initiative-funnel), Skill(running-work-transitions).